【Introduction】:The Chengdu Metro officially opened on October 1, 2010. Line 1 runs from Shengxian Lake to Guangdu (south-north).

The Chengdu Metro officially opened on October 1, 2010. Line 1 runs from Shengxian Lake to Guangdu (south-north). Line 2 opened in September 2012. Line 3 opened in July 2016. Line 4 opened in December 2015. Line 3 (Phase 2 and Phase 3), Line 4 (Phase 2), Line 5 (Phase 1, Phase 2), Line 7, Line 10 (Phase 1, Phase 2), Line 18 (Phase 1) are currently under construction. Future plans call for more than twenty lines.

Operation Time:

Line 1: Shengxian Lake 6:20-22:50, Guangdu 6:20-22:50

Line 2: Longquanyi 6:10-22:30 Xipu 6:10-22:30

Price Range: starting at 2 RMB for 6 stops, 3 RMB for 12 stops, 4 RMB for 16 stops, 5 RMB for 24 stops, 6 RMB for 32 stops, 7 RMB for 40 stops. After this 1 RMB is for per 8 stops.